At Mir Construction, we take pride in providing top-notch earthwork services as a trusted subcontractor. Our team recently partnered with BFL to help lay the groundwork for a new 14,000 SF building project.
Our scope included building over-excavation and pad preparation to ensure a stable, level base for construction, along with subgrade preparation for a parking lot that will support safe, long-lasting infrastructure. We also managed the installation of sanitary sewer services and water lines, supporting essential utilities and setting up the site for efficient operations. Every task we handle is done with a focus on quality and durability to help our clients achieve their project goals safely and effectively.
TAMS Bead Blast Booth Site
September 20, 2024
Overview of Our Project
We recently participated in a significant project at the TAMS Bead Blast booth site, where our expertise was essential in executing crucial groundwork. Our work focused on excavation and subgrade preparation for the airfield pavement, covering an impressive 18,000 square feet. This undertaking showcased our commitment to delivering high-quality infrastructure projects.
Key Aspects of Our Contribution
In addition to the excavation, we also took on the challenge of installing a 12-inch water line reroute, spanning 760 linear feet. The new storm drainage system and sanitary sewage for the upcoming structure were vital components that we successfully integrated into the project. These enhancements not only improve operational efficiency but also ensure compliance with environmental standards.
Storm Water Drainage System Installation
An essential part of our contribution involved the installation of a new storm water drainage system. This system was meticulously designed to manage runoff, protect the area from flooding, and maintain environmental standards. By efficiently directing storm water away from critical structures, we’ve added another layer of safety and resilience to the project’s infrastructure.
Electrical Duct Bank Installation
Another remarkable aspect of our project was the installation of 1,700 linear feet of electrical duct bank. This work involved careful planning and execution to ensure that the electrical systems are reliable and durable for the facilities at the TAMS site. The completed project reflects our dedication to excellence in all stages of construction, from groundwork to the finishing touches.